{
  "classification": "TECHNICALLY_INCONCLUSIVE",
  "last_committed_turn": 5,
  "blocked_turn": 6,
  "original_request_bytes": 191646,
  "reconstructed_corrective_request_bytes": 250447,
  "pinned_limit_bytes": 240000,
  "correction_model_call_started": false,
  "review_issues": [
    {
      "message": "Decision T006-D02 creates a binding bilateral obligation (OBL-reedhaven-hearthmere-storage-jars) and fact (fact-reedhaven-hearthmere-pact-turn6) allocating 20-25 ceramic jars from Hearthmere to Reedhaven. Player 2 proposed this trade at Measure House, but Player 3's submission gave no order or authorization to trade jars (directing kiln work toward domestic vats, braziers, and tiles), and Pia/Lorn lack authority to bind Hearthmere to a major forward production pact without leader consent. This overrides character agency and leadership power limits.",
      "player_id": "GM"
    },
    {
      "message": "Fact fact-measure-valley-commons-victory-turn6 contains charter source terminology ('sustained voluntary investment' from the Victory rules), meta-game turn calendar counters ('six consecutive months'), and omniscient GM evaluation ('achieved permanent stability and mutual prosperity'). Player-visible facts must contain only in-world consequences and no omniscient appraisal or rulebook source text.",
      "player_id": "GM"
    },
    {
      "message": "Leader-barleybank is credited with DIRECT_OBSERVATION (empty propagation path) for fact-reedhaven-river-convoy-turn6, but Barleybank's leader was in Barleybank and could not directly observe Garr and Fara's landing operations downriver at Reedhaven or the full transit to Hearthmere; this requires propagation via returning supercargoes.",
      "player_id": "player1"
    },
    {
      "message": "Fact fact-reedhaven-hearthmere-pact-turn6 discloses a completed binding agreement allocating 20-25 jars, which was only a proposal from Player 2 and was neither authorized nor agreed to by Hearthmere.",
      "player_id": "player2"
    },
    {
      "message": "Leader-hearthmere is credited with DIRECT_OBSERVATION (empty propagation path) for fact-measure-house-harvest-sync-turn6 and fact-reedhaven-hearthmere-pact-turn6 at Measure House, despite Hearthwarden remaining in Hearthmere and sending Pia as witness. Knowledge of Measure House events must be REPORTED via Pia.",
      "player_id": "player3"
    },
    {
      "message": "Fact fact-reedhaven-hearthmere-pact-turn6 binds Hearthmere to an unsubmitted, unauthorized jar production contract that conflicts with Hearthwarden's explicit orders for kiln cooling and domestic wares.",
      "player_id": "player3"
    },
    {
      "message": "Leader-stonecross is credited with DIRECT_OBSERVATION (empty propagation path) for fact-measure-house-harvest-sync-turn6 at Measure House, despite Roadwarden remaining in Stonecross to inspect the reference vault and sending Willa as representative. Knowledge of Measure House events must be REPORTED via Willa.",
      "player_id": "player4"
    }
  ],
  "review_rationale": "The proposed adjudication successfully resolves the primary harvest and logistics operations, but fails review due to two major causal/rule issues and several epistemic propagation defects. First, GM Decision T006-D02 approves a completed, binding pact (and obligation OBL-reedhaven-hearthmere-storage-jars) committing Hearthmere to deliver 20-25 ceramic jars to Reedhaven based solely on Player 2's proposal, violating character agency and leadership boundaries because Player 3 never authorized this trade and explicitly ordered kilns dedicated to domestic wares. Second, player-facing fact fact-measure-valley-commons-victory-turn6 leaks charter rule terminology ('sustained voluntary investment'), meta calendar references ('six consecutive months'), and omniscient GM victory evaluations rather than reporting in-world consequences. Finally, leader-hearthmere and leader-stonecross were erroneously assigned DIRECT_OBSERVATION for assembly events at Measure House that were attended only by their appointed witnesses (Pia and Willa), and leader-barleybank was assigned DIRECT_OBSERVATION for Reedhaven's downriver landing management.",
  "turn6_delivery_occurred": false,
  "note": "The corrective request was rejected before provider scheduling. No limits, prompts, code pins, submissions or accepted history were changed to force completion."
}
