# Pressure Summary

> Generated from `broken-measure-trunk-01-state` at 2026-09-11T12:43:18.750Z.
> Schema sim-1.0.0; source broken-measure-trunk-01-turn-001; SIMULATION.

| Pressure | Status | Progress | Current state | Updated turn | Visibility |
|---|---|---|---|---|---|
| Barleybank spring work | ACTIVE | — | The lower drainage ditch has been cleared down to gravel and the seed loft roof secured against rain. | 1 | PLAYERS |
| Hearthmere spring work | ACTIVE | — | The communal oven flue has been rebuilt and fuel elevated on drying racks; roof patching is underway. | 1 | PLAYERS |
| Reedhaven spring work | ACTIVE | — | The loose landing post has been stabilized with ballast and fascines; dock operations are secure. | 1 | PLAYERS |
| Stonecross spring work | ACTIVE | — | Drainage weep channels and timber cribbing have arrested retaining wall movement without exhausting oxen. | 1 | PLAYERS |
