COMPLETION GATES
Structured literal evidence. Expand a field to inspect its contents; the source link preserves the exact JSON bytes.
status
EVALUATED_WITH_TECHNICALLY_INCONCLUSIVE_CONTROL_ENDPOINT
completed at
2026-09-11T13:35:57.910Z
gates
authority
PASS: explicit user scope/model/budget approval
catalogue
PASS: 10 dossiers frozen before scenario generation
design
PASS: handoff design and pre-registration implemented before calls
fixture
PASS: 75 pre-run tests; supplemental recorded replay kept distinct
trunk
PASS: two commits plus locked Turn 3 analysis
pairing
PASS: 330 copied files and causal GM inputs match
review
PASS for both decisive turns and every commit; control Turn 6 review rejected and blocked publication
completion
Terminal classifications established: enabled completed six turns; control technically inconclusive after five
evaluation
PASS: structured comparison, materiality review, preserved/corrected blind review and downstream diagnosis
publication
PASS: final local report separates engineering, voluntary use, comparative value and untested claims; no site publication requested
aggregate
calls
121
tokens
3301784
elapsed ms
2513748
final report sha256
a2dd5207998b5040b1dbc44248ef90e40fafb4a5e76ac6279fc158b48acbcc41
followup
A separate future recovery would need a newly pinned correction-packet implementation and auditable configuration. This execution is preserved unchanged.