SIMULATION · SHARED · Turn 001

· Co-GM evidence, including information private during play

Pressure Summary

Generated from broken-measure-trunk-01-state at 2026-09-11T12:43:18.750Z. Schema sim-1.0.0; source broken-measure-trunk-01-turn-001; SIMULATION.

Pressure Status Progress Current state Updated turn Visibility
Barleybank spring work ACTIVE The lower drainage ditch has been cleared down to gravel and the seed loft roof secured against rain. 1 PLAYERS
Hearthmere spring work ACTIVE The communal oven flue has been rebuilt and fuel elevated on drying racks; roof patching is underway. 1 PLAYERS
Reedhaven spring work ACTIVE The loose landing post has been stabilized with ballast and fascines; dock operations are secure. 1 PLAYERS
Stonecross spring work ACTIVE Drainage weep channels and timber cribbing have arrested retaining wall movement without exhausting oxen. 1 PLAYERS